Posts By :

Simon Jones

Minimise pollution events resulting from pumping station backup failure

Minimise pollution events resulting from pumping station backup failure 1200 1200 Coteq Solutions

Benefits:

  • Minimises Pollution risk: By regularly testing the backup circuits, the risk of pollution events on site are lowered significantly.
  • Reduces need to attend site: Automatic testing and the additional function to remotely test the hardwired backup, reduces need for on-site checks of the operation of the Hardwired backup circuits.
  • Test times optimised: The times at which the Testing is run can be controlled to fall within working hours, minimising any call out costs for faulty hardwired backup resolution works required
  • Minimises the health and safety risk of float switch manipulation: Due to the automatic function of regularly running the backup systems, the need to undertake site manipulation of float switches (requiring access to wet well hatches etc) is reduced significantly.
  • Clear visibility on the ‘health’ of every pumping station backup: Consistent backup testing functions across all sites promptly reports any issues.
  • Very compact: 120mm x 120mm x 95mm (Footprint is not much larger than a fused spur enclosure). Fits inside most existing MCC Control sections
  • Simple to install: Simple connectors for all I/O and power.

Read more at Coteq Systems Panels